Why Webill Green

The Webill edge.

South Africa's electricity market is being built now. Webill Green is one of very few platforms that can carry a trade through it from end to end, and the only one we know of that does it on a single ledger, for every party.

Others handle a slice. Webill Green carries the whole trade.

A traded kilowatt-hour needs ten jobs done, in order, for every party, every month. Most tools do one or two of them; spreadsheets carry the trade between the rest.

Wheeling and matching software

Virtual Wheeling data platforms

The Market Operator's exchange

Billing systems

Certificate registries

  1. ContractPPAs, proposals, signatures
  2. Meter20-minute intervalsAlso covered by wheeling and matching software
  3. AllocatePublished rules, every intervalAlso covered by wheeling and matching software
  4. WheelEskom and municipal, each onceAlso covered by wheeling and matching software
  5. RefundEskom Virtual WheelingAlso covered by Virtual Wheeling data platforms
  6. TradeDay-ahead, intraday, imbalanceThe Market Operator runs the exchange; Webill Green is your side of it
  7. SettleA ledger that sums to zero
  8. BillStatements, invoices, credit notesAlso covered by billing systems
  9. CertifyCertificates and the carbon venueRegistries issue; Webill Green mirrors and trades
  10. ReportThe carbon-tax return packPlanned release

Webill Green: all ten jobs, on one ledger

Each kind of tool covers part of the chain, and spreadsheets carry the trade between them. Webill Green carries it the whole way. The exchange itself belongs to the Market Operator, and the carbon-tax pack, drawn dashed, is prototyped and tested but not yet released.

Six advantages, each one built.

Every claim on this page points at something that exists in the product today, or says plainly when it is still to come.

One ledger for the whole book.

Bilateral PPAs, Eskom Virtual Wheeling, wholesale trades, network charges and certificates settle in one engine and land on one double-entry ledger. The month closes once, every party sees the same figures, and the Money Room builds its profit and loss from the same documents.

See a settled day

Settled on the same ledger

  • Physical PPA energy
  • Virtual PPA differences
  • Virtual Wheeling refunds
  • Day-ahead sales
  • Intraday trades
  • Imbalance
  • Network charges
  • Market fees
  • Grid residual
  • Spill and shortfall
  • Curtailment
  • Certificates

Every line has a partner. Σ = R 0.00 ✓

Both networks, each charging once.

A wheeled kilowatt-hour can cross Eskom's network and a municipality's. Webill Green routes across both, applies each network's losses and charges exactly once, and pairs every charge with the buyer line that pays it.

Follow the route

One wheeled day, charged once per network

Eskom Transmission
Transmission 18 c and ancillary 2 c
Municipal network
Wheeling 11 c and distribution 13 c
Buyer
Pays each line once, matched by its partner

Ready for the wholesale market before it opens.

The Market Operator runs SAWEM's exchange. Webill Green is the participant's side of it, built to Market Code revision 2.3 and rehearsed every day against a simulated market of fifty participants. When the market opens, the desk is already built and rehearsed.

The market day, gate by gate

The participant side of SAWEM

  • BuiltDay-ahead bids before the 10:00 gate
  • BuiltFive intraday auctions
  • BuiltCredit cover checked before submission
  • BuiltImbalance and settlement statements
  • WaitingLive link, on the Market Operator's interface

Neutral, so every party can use it.

Webill Green is not a generator, a trader or a wires owner, and it takes no position. A trader's platform serves its own book; Webill Green settles for the IPP, the trader and the buyer on the same terms, so both sides of a deal can sign the same statement.

Every seat it serves

Who settles on it

  • IPPs
  • Traders
  • Off-takers
  • Balance Responsible Parties
  • Finance teams
  • Carbon leads

What it never does

  • Generate power
  • Own wires
  • Take a position
  • Change how the market clears

Built for rules still being written.

Tariffs, loss factors, network charges, tax rates and draft trading rules live as effective-dated rows, not code. When NERSA finalises a rule or Treasury moves a rate, a row changes, and every past period still settles on the rules of its own dates.

The changes coming

Rules as rows

RuleValueStatus
Contestable customersfrom 1 MVADraft
Generators coveredabove 100 kWDraft
Carbon tax, 2026R 308 a tonneLaw
Carbon tax, 2030R 462 a tonneLaw
Basic allowance, to 203060%Law

Human sign-off and proof, built in.

NERSA's draft framework keeps automated trading off SAWEM for its first five years. Webill Green already works that way: engines compute, people approve, and four eyes sit on every limit. Every statement and pack carries a SHA-256 audit index and rebuilds byte for byte from its evidence.

Evidence and controls

Only a person moves a statement to FINAL

  1. Draft
  2. Preliminary
  3. Final

Four eyes on

  • Risk limits
  • The kill switch
  • The automation level

Ready before the market is.

The rules arrive in stages. The platform that has to run them is built now, so each stage is a switch-on rather than a project.

Built and rehearsed today

  • Bilateral PPAs, physical and virtual, from proposal to signature
  • Wheeling settlement across Eskom's and municipal networks
  • Virtual Wheeling allocation and refund reconciliation
  • The SAWEM participant desk, on a 50-participant simulator
  • Billing: statements, invoices, credit notes and month packs
  • Certificates and the carbon venue

What the market still has to do

  1. Now

    NERSA finalises the trading rules and the trading-platform framework.

    Draft
  2. April 2027

    SAWEM opens, in phases, with full competition towards 2030.

    Scheduled
  3. By 2029

    An independent Transmission System Operator takes over the grid.

    Law
  4. To 2030

    The carbon tax climbs to R 462 a tonne.

    Law

Built in South Africa, made to travel.

The core is the same in every market: contracts, interval matching, a double-entry ledger, invoices and evidence. Each market changes the shell around it: the settlement grain, the operator, the certificates and the tax. Britain calls it a sleeved PPA. The engine does not care.

The core that travels unchanged

  • Proposals and negotiation
  • Interval matching, at any grain
  • The double-entry ledger
  • Invoices and credit notes
  • Disputes and reconciliation
  • The Money Room
  • Forecasting and risk
  • The API and webhooks
  1. 1

    South Africa

    Live

    20-minute wheeling intervals, hourly market periods

    Wheeling over Eskom and municipal networks, Eskom Virtual Wheeling, SAWEM from 2027, I-RECs and the carbon tax.

  2. 2

    Great Britain

    Preview deployment

    Half-hourly settlement under the Balancing and Settlement Code

    One national price, every meter moving to half-hourly data by 2027, corporate PPAs sleeved through licensed suppliers, REGO certificates and the UK ETS.

    Webill Green brings interval-matched sleeving settlement and one invoice per counterparty, for independent generators and the suppliers who sleeve for them.

  3. 3

    Texas

    Preview deployment

    15-minute settlement in ERCOT

    One market and one regulator, retail choice, nodal prices, real-time co-optimisation since December 2025, virtual PPAs as the corporate route and RECs tracked by ERCOT itself.

    Webill Green brings virtual PPA settlement, REC accounting and invoice-grade statements, in dollars.

  4. 4

    Spain

    Planned

    15-minute day-ahead coupling across Europe since October 2025

    One of Europe's largest PPA markets, with one regulator and one grid operator, guarantees of origin and the EU ETS.

    Webill Green brings PPA settlement at 15-minute grain, guarantees of origin and invoices in euros.

  5. 5

    Australia and New Zealand

    Planned

    5-minute settlement in Australia; 48 half-hour periods in New Zealand

    Australia's gross pool with regional prices, loss factors and large-scale generation certificates; New Zealand's nodal market, where new rules from July 2026 give independents hedges on equal terms.

    Webill Green brings retailer sleeving settlement and certificate handling, entered as one region.

Each market runs as its own deployment, in its own currency, time zone and rules. Great Britain and Texas run today as preview deployments; each launch waits on a licensed local partner.

The engineering behind the claim.

Engine
24 domains on one ledger
Tests
More than 8,000, automated
Screens
More than 170, for every seat
Market rulebook
Market Code v2.3; compliance self-assessed
Rehearsal market
50 simulated participants, a month in seconds
Built for
SAWEM, Eskom, municipalities, SARS, SAPP and an OAuth API